2rd Risk Management Plan


Project Name:   2D Animation
Class:                41328-3B
Name:                Ho Kim Pong
 
Risk No
Risk Event
Probability
Impact
Mitigation
Contingency
1
Team Member work does not match that their style, track is different.
High
High
- Prepare a detail document and guideline that everyone sees this document.
-Analyze team Member work and use to other way.
2
Team Member has a wrong perspective drawing
High
High
- Learning a accuracy perspective drawing form lecturer.
-Use the 3D Layer try to make it like a perspective drawing