Project Name: 2D Animation
Class: 41328-3B
Name: Ho Kim Pong
Risk No | Risk Event | Probability | Impact | Mitigation | Contingency |
1 | Team Member work does not match that their style, track is different. | High | High | - Prepare a detail document and guideline that everyone sees this document. | -Analyze team Member work and use to other way. |
2 | Team Member has a wrong perspective drawing | High | High | - Learning a accuracy perspective drawing form lecturer. | -Use the 3D Layer try to make it like a perspective drawing |